| |
|
|
|
|
|
|
 |
|
| © Copyright 2008 Compare Infobase Limited. |
|
Extensive renovation work of Humayun\'s tomb was done by Aga Khan Trust for Culture and was completed in 2003. After the restoration, water flowed through the narrow water channels passing through the walkways that had been dried up. The small fountain along with narrow water channels presents a beautiful view to the tourists coming there to see the historical monument. |
|
|
|
|
|
|
|
|